Cowra - Construction, September 2026
Work resumed this month on the backyard modules and the J-pieces. One of the backyard modules was set up on layout legs, and the corresponding J-piece carefully aligned with it. These were clamped together, and 10mm diameter holes were drilled through both end plates at the same time using a drilling jig. These 10mm holes are for the custom alignment pins, whose primary purpose is to ensure that the modules go together in exactly the same way each time they are put together. This is especially critical for track alignment across module joins. Therefore the alignment pins were positioned as far apart as possible in the J-piece end plate. Each of the 2 halves of the alignment pins were then placed into position onto the back of each of the timber end plates and screwed into place. This is a similar process to what was done for aligning and joining the 2 front sceniced modules (refer to the December 2025 construction update).
We began preparation for installing the over-centre clamps for joining each J-piece to its corresponding backyard module. Clearance holes were cut out of the end plates in both modules using a jigsaw. Additional plywood was installed beside the clearance holes to provide extra support for the screw fixings for the over-centre clamps.
The outside face of the end of a storage module that connects to a J-piece. The female components of the custom baseboard alignment pins can be seen to the left of each rectangular hole for the over-centre clamps.
The inside face of the storage module end. Two lengths of 12mm ply were glued together, then glued and screwed in place to provide a solid anchor for the over centre clamps. The back of the female pieces of the custom baseboard alignment pins have been screwed in place.
On the 2 front sceniced modules, work continued in a couple of areas. A rail rack was scratchbuilt using code 55 rail soldered together. It was loaded up with various lengths of code 55 and code 75 rail. The whole assembly was painted with Humbrol acrylic Rust. Holes were drilled in the plywood module base and the rail rack was glued in with PVA glue. It is located in the area of the yard as shown in both the 1955 and 1971 station yard arrangement drawings.
An excerpt from the 1971 station yard arrangement drawing showing the location of a rail rack. This also appears in the 1955 station yard arrangement drawing.
The completed rail rack shown installed on the layout.
The area around where the former Railway Institute building will go received some basic scenery. Static grass was applied to the area between the former Railway Institute building and the end of Kendall St. A mix of 2mm and 4mm was used in both Light Green and Straw colours. The pale dirt road leading through the gate off the station entry road from Lynch St, was made by sifting Buff coloured tile grout, dry brushing it into place, and then misting it with water to ‘set’ it in place. Once the grout was dry, a scalpel was used to shave small pieces from a Raw Sienna pastel paint stick which were dropped onto selected areas of the Buff dirt road. These were then stippled into the surface of the road using a small firm-bristled paint brush. The areas around the edge of the Buff dirt road and behind the recently installed fence (described in last months update), were sceniced with various shades of Woodland Scenics fine ground foam and fine leaf foliage in light green to represent shrubs and undergrowth.
Scenery applied to the area around the former Railway Institute building. The station access road off Lynch St is in the foreground at the right. Kendall St can just be seen in the background at top left. More trees and shrubs will be added to this general area later on.