During October we exhibited our current layout Goulburn at the Rosehill Great Train Show organised by the Epping Model Railway Club. What a fantastic exhibition and we were so pleased to be able to be a part of it.
Fortunately during October we were also able to squeeze in some work on the new layout. The back storage yard and J-pieces have a dedicated 5 Amp Digital Command Control (DCC) booster and circuit breakers to provide plenty of power to all the stored trains. The booster has no in-built means for mounting to a layout, so we came up with a solution that does not modify the booster in any way. The M3 screws on the bottom that secure the chassis lid, now pass through two pieces of 20mm x 20mm aluminium angle, which in turn are screwed to 12mm ply L-brackets. A shelf made from 4mm hardboard was glued and nailed behind the booster for the power supply to sit on. The whole fixture will then be screwed to the underside of a storage yard module.
Front and underside view of the booster and power supply shelf. The booster's chassis lid screws can be seen passing through the aluminium brackets, which hold the unit firmly in position.
Top view of the booster and power supply mounted in the shelf. A hole was cut for the mains power cord to pass through. A piece of 4mm hardboard backing and lengths of 12mm ply strip were glued or screwed adjacent to the supply to hold it in place.
After successfully creating one shelf system we then cut and prepared enough pieces to construct three more shelf units that will be needed for DCC command stations that use the same chassis, on other modules. These will be assembled later on.
On the front sceniced modules, a strip of 4mm thick hardwood plywood was cut and fixed to one of the front modules as a fascia. The strip of plywood was first clamped in place and the line for the top edge marked with a black sharpie pen by tracing along the scenery contours immediately behind the front fascia. The fascia was then removed and the top profile edge cut using a jigsaw. After a light sanding the front face was given a coat of white undercoat paint, before it was glued into place on the front of the module. Temporary clamps held the fascia secure until the glue set. This now means that scenery can be continued all the way along the front of this particular module. A similar approach will be taken with the other front sceniced module in due course.
Part view of the undercoated timber fascia fixed to the front of one of the front sceniced modules.
The join between the 2 front sceniced modules. The fascia has been fitted to the right hand side module but not yet to the left hand module.
At Cowra a water column for supplying water to steam locomotives is located adjacent to the main line at the foot of the hill below the water tank. The model version was built using a Uneek models kit #680, which is an excellent representation of the real item. The water column, drainage pit and white timber post, that all form part of the kit, were all fixed to a small piece of styrene to make it easier for handling and painting at the workbench. Once completed the whole assembly was then glued into place on the module using contact cement underneath the styrene base. Scenery around the water column assembly is a mix of ballast and fine ground foam, to blend it into the scene.
The completed model of the water column installed adjacent to the main line. The under construction water tank is temporarily in place on the hill beyond.
A photo of the real water tank and water column at Cowra taken in 2025.