Wallerawang - Construction, April 2008
Construction of "Wallerawang" has been underway since early 2007.
The station building is already complete, having been scratchbuilt during the winter of 2007. The two front modules and two end modules have been built and track has been laid on the front modules and around to the middle of each end module. Two sliding drawers were built and fitted, which will hold the control panels for each front module. The control panels have been designed and are ready to be mounted.
All track on the front modules has had the sleepers and the side of the rails painted. The track has also been ballasted, and once the wiring is completed, the track blocks will be cut. Contruction has started on the road bridge located at the western end of Wallerawang.